Wednesday, 18 February 2015

Refurbishment update 3

Well the Gym is redecorated, the curtains and blinds will be replaced after the flooring has been replaced.  Work on the Gym floor will take place on the 18th, 19th and 20th March and we will need to be partially closed whilst this work is carried out.  We won't have access to our overhead hoists so oxygen therapy for people who need hoisting into a chamber chair will also unfortunately be disrupted.  We are currently working out how we can best manage services during this time, and will give our clients as much notice as possible if we need to cancel appointments. 




The two back individual physiotherapy rooms are now redecorated, the toilet in between these rooms will be installed over the next week and the flooring should be complete by the end of next week finishing off this area.  Work will then begin replacing the toilet and shower off the gym turning it into a toilet and wet room.




The kitchen is currently being installed and we hope the flooring will be laid at the end of next week, along with flooring in the Shop and Dieticians room.  The drinks station by the shop will also be replaced over the next couple of weeks.




The decorators have started in the circulation area and will then be moving into the office. That should keep them busy for the next couple of weeks and I'll update you again when we know the next areas that will be worked on.




The contractors are doing a magnificent Job, the main contractor is
Tilby Ltd  http://tilby.uk.com/ 
Interior design by Lesley Ann Gentry http://lesleyanngentry.com/#&panel1-1
Kitchen by Design Matters http://www.dmkbb.co.uk/ 
and the toilet and wet room by Motion Spot http://motionspot.co.uk/ 
A fantastic team to be working with and we can highly recommend all of them!